Escea EF5000 Installation Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
630162_5EF5000InstallationGuideRemotion‐US
8.0 Laying Gas Pipe:
Gas pipe should be sized as per the requirements of your local council. The pipe sizing must
be sufficient to deliver the following volume of gas to the heater with all other gas appliances
in the home running at the same time;
EF5000 = 60 Mj/hr - 56,000 Btu/hr
It is highly recommended to install an easily accessible isolating shut off valve (ball valve)
along the gas line to the EF5000 unit.
8.1 Solid pipe should be run to the inside lower left hand side of the fire. Insert the supplied
rubber plug and cut it as shown below to allow the gas pipe to pass through, keeping the
plug as air-tight as possible.
Gas Pipe Entry Point
8.2 It is required by law that an approved shut off valve (not supplied) be installed in the line
between the EF5000 Gas Fire and the gas supply.
8.3 All hoses and gas pipes must be located out of pathways where people may trip over it and
must not be in areas where the hose may be subject to accidental damage.
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 21 22

Comments to this Manuals

No comments