Escea IB600 Installation Manual Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
630184_4 IB Installation Manual NZ
23
20.0 Fixing the Heater to the Base and Wall:
There are several ways that the heater can be fixed against movement: It is a requirement
that this heater be securely fastened to the wall and base.
Note: It is important that the outer fascia is used during this process to ensure that the
heater is located in the appropriate position within the cavity.
20.1 Fixing Heater to Base:
The heater has several holes along the front edge of the base panel that have been
provided to allow installers to screw the heater to the floor. Because of a lack of access for
drilling it may be necessary to mark the appropriate location for these screws and then
remove the heater and drill holes into hard flooring.
Alternatively a socket set can be used to drive in hex headed screws.
20.2 Fixing Heater to Wall:
The installer must also fix the heater to the sides of the cavity using the bracket
kit provided. These brackets must be installed over the outer lining
surface of the wall i.e. over the Plaster Board rather than
onto a stud which is then subsequently covered
with a wall lining. Otherwise the fire will be
sitting too far back and will inhibit
the outer fascia panel from
fitting correctly.
Install gas lines to
any of these 3 points.
Leave enough piping
to reach the front
right hand corner of
the ZCK once
installed.
Electrical
point of
entry.
Final gas connection point
(after ZCK installation)
Plan view from top looking down.
Gas pipe
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 47 48

Comments to this Manuals

No comments